Contact

How to build calibration asset data compatible with CMMS and calibration software

 

Jody Damron | Operations & Maintenance Scheduling Supervisor
Salt River Project

 

Join Jody Damron and learn how to avoid the common pitfalls when building calibration data for CMMS and Calibration Systems, the data points that provide value to both systems, how asset and calibration visibility can be provided to all users, and examples of asset and calibration documentation that supports troubleshooting in the field.

Learn more about how one of America’s largest public power utilities implemented an all-encompassing integrated calibration solution

Read the Salt River Project Case Story


 

This recording is from the 2021 Beamex Annual Calibration Exchange (ACE). 

Other topics covered in this two-day event include:

How to transition from paper-based CMMS to calibration software
Addressing educational gaps in automation today
CMMS and calibration management integration
Multi-variable flowmeter best practices
And much more!


You can watch all recordings via the ACE Video Landing Page.

 

Watch Now